Learning path
Assign folo meetings
Last updated: November 2026
If you use folo, the time of every finished call is already in Døgn. You only say which project it belongs to. Without folo, you won’t see any of this.
Assign meetings
“Today” then shows something like “1 meeting from folo waits for a project”. “Assign ›” opens the “Assign meetings” page with everything that’s waiting. Pick a project for each. If Døgn finds a matching project, it’s already there as a suggestion, with a short reason.
“Apply” books every row with a project, the others keep waiting. In the panel you go through the meetings one at a time instead, and “Review the day” lists them too.

Ignore or discard
Not every call is work time. A row’s ⋯ menu gives you two ways:
- “Ignore in Døgn”. The meeting leaves the list, the entry stays. “Stop ignoring” brings it back.
- “Discard”. This deletes the entry. Døgn asks first.
The meeting in folo stays unchanged either way.
How the data moves
Døgn, folo and tjent share clients, projects and time in the shared kveik folder on your computer. Nothing goes online for this. Settings › folo & tjent shows which apps Døgn has found. If an app isn’t installed, Døgn hides everything that belongs to it.
